Twitter

PCMS Engineering

We are leaders in intelligent maintenance and condition monitoring solutions, and work across a variety of industries.

Our specialist engineers have over 30 years of industry experience and utilise a wide range of analysis tools, monitoring techniques and technologies to undertake, design and support comprehensive maintenance programmes.

Working in close association with businesses, we offer a full review of existing maintenance capability, outline any reliability recommendations and design bespoke solutions. Read More

  • 0
  • 0
  • 0
  • 0
  • 0

Recent news

Case Studies

Condition Based Maintenance Programme Results In £295,000 Cost Avoidance

GulfMark, tasked PCMS Engineering with rolling out a Condition Based Maintenance Programme throughout their modern fleet of offshore vessels.

Read More

Network Rail, Wagon Axle Bearing Maintenance Deferral

PCMS were requested to carry out a multi-technology health check on Network Rail’s fleet of track maintenance support wagons’ axle bearings.

Read More
Thermal Analysis

Train Operator Extend’s In-service Life Of Their Fleet Of Carriages

PCMS worked in conjunction with a train operator to extend the in-service life of their 16 car fleet 30 year old EMU's (Electronic Multiple Unites).

Read More
Thermal Analysis

Thermal Analysis Highlights High Electrical Load In Railway Rolling Stock

PCMS Engineering worked with the fleet at London Underground to undertake a full thermographic survey of electrical equipment.

Read More
Electric Tram Pantograph

Electric Tram Pantograph/Catenary Fault Detection

PCMS Use Video Footage To Identify Fault On Electric Tram Pantograph.

Read More
Nuclear

Equipment Reliability Model Returns 8% Maintenance Cost Reduction

Equipment Reliability Model returns a 8% Maintenance Cost Reduction at nuclear plant.

Read More
Stress wave monitoring saves money

£4M cost avoidance through fleetwide application of Stresswave Monitoring

A north sea platform supply vessel operator reduces failures from five to zero per year, saving an estimated £4 million.

Read More
Sellafield

Integrated Work Management Underpins £15M Productivity Improvements

Integrated Work Management service saves nuclear site £15m per year in productivity improvements and efficiency savings.

Read More
Hydraulic Integrity Testing

Hydraulic Integrity Testing identifies cause of fatal accident

Hydraulic Integrity Testing identifies cause of fatal accident at a UK coal mine

Read More
Mixer Reduction Gearbox

Stresswave Tests Identify Defected Bearing in Gearbox

PCMS performed an independent health assessment check on the Mixer reduction gearbox at Contitech to determine if the internal components were fit for operational purpose.

Read More