Twitter

Energy Loss Surveys combine Thermography and Ultrasonic Air-Leak technologies to identify and quantify energy losses from steam heating pipelines, compressed gas systems, refrigeration pipelines, boilers, hot water systems and building infrastructure.

PCMS Engineering’s non-intrusive Survey provides Maintenance and Facilities Managers with a report highlighting:

  • Exactly where problem areas exist
  • Quantifying the annual cost of the energy wastage
  • Calculating the repair costs
  • Calculating a return-on-investment in weeks
thermography

Thermography Heat-Loss and Ultrasonic Air-Leakage Energy Loss Surveys:

1

Reduce Energy Costs

2

Quantify Energy Savings

3

Increase Plant Efficiency

4

Decrease Carbon Emissions

Energy loss survey

  • Combines Ultrasonic Leak Detection with Thermographic Heat Detection to identify and quantify leaks in Compressed Gas Systems, Heat Losses from Boilerhouses, steam pipelines and valves, hot water systems, building infrastructure, and heat ingress into chilled water refrigeration pipelines.
  • Onsite survey is entirely non-intrusive to plant or process.Survey Report provides details of all leak, fault and un-insulated locations identified, quantified annual Energy Losses in local currency, calculated repair costs to rectify leaks, return on investment figure in weeks.
  • Survey suitable for processing and production sites worldwide.
  • Full Energy Loss Survey is tailored to suit the systems in operation at each Plant. PCMSeng will advise on which areas can be prioritised to identify areas which exhibit the greatest energy loss.

Air leak survey

  • Ultrasonic Leak Detection Survey by a PCMS Specialist Energy Survey Engineer, to identify and quantify leaks in Compressed Gas Systems, including Compressed Air and Nitrogen.
  • Onsite survey is entirely non-intrusive to plant or process.
  • Survey Report provides details of all leak locations identified, quantified annual Energy Losses in local currency, calculated repair costs to rectify leaks, return on investment figure in weeks.
  • Survey suitable for processing and production sites worldwide.

Boiler house survey

  • A 1-day Energy Loss Survey tailored to survey boilers and associated pipelines to quickly identify large, big-hit energy losses.
  • Survey Report provides details of all un-insulated and fault locations identified, quantified annual Energy Losses in local currency, calculated repair costs to rectify leaks, return on investment figure in weeks.
  • Survey suitable for UK processing and production sites.

Other Services Available

At PCMS Engineering, we have the expertise and resources required to offer a range of different services to help you optimise your machinery and facilities.

Choose from any of the services below to find out more information about how PCMS Engineering can help you.

Accredited Training

Learn More

Condition Assessment

Learn More

Condition Monitoring

Learn More
FAT

Factory Acceptance Testing

Learn More

Work Management

Learn More

Contact Us

For more information regarding our Condition Assessment services, contact us using the form below or email info@pcmseng.co.uk